Bathroom Remodeling in the Twin Cities

Waterproofing, tile and fixtures detailed so a Minneapolis or Saint Paul bathroom holds up to real winters and real daily use.

Overview

The parts you cannot see decide the outcome

A bathroom lives or dies behind the tile. Waterproofing membrane, slope to drain, and ventilation sized for Minnesota humidity swings matter more than any fixture finish, so we treat that layer as the actual project and the tile as the visible result of doing it correctly.

Many Twin Cities bathrooms also sit above older framing with plumbing runs that were never meant to carry a curbless shower or a floating vanity. We plan the structural and rough-in changes early, before finishes are chosen, so the final room is not a compromise.

  • Waterproofing first

    Sheet or liquid membrane systems installed and tested before a single tile is set.

  • Ventilation sized right

    Exhaust fans matched to room volume so mirrors clear and moisture does not sit in framing.

  • Universal design options

    Curbless entries, blocking for grab bars and comfort-height fixtures planned in from the start.

Project Types

Bathroom projects we take on

From a powder room refresh to a full primary suite rebuild.

  • Full bathroom remodel

    New waterproofing, tile, vanity, fixtures and lighting with plumbing and electrical brought up to current code.

  • Primary suite renovation

    Combining or expanding a primary bath, often borrowing space from an adjacent closet or bedroom.

  • Curbless and accessible showers

    Zero-threshold entries with linear drains, designed for aging in place without looking clinical.

  • Powder room and half bath

    Small-footprint rooms where fixture selection and finishes carry the whole design.

  • Tub-to-shower conversion

    Removing an old tub for a walk-in shower, with framing and drain relocation handled cleanly.

  • Basement and secondary baths

    Full baths added below grade, coordinated with sump and ejector pump requirements.

Materials

Materials and finishes

We specify for standing water and freeze-thaw humidity, not just showroom appearance.

Waterproofing systems
Sheet membranes, liquid-applied barriers and pan liners matched to the shower geometry.
Tile
Large-format porcelain, natural stone and mosaic, set with movement joints where the room requires them.
Vanities and counters
Custom and semi-custom cabinetry with quartz or natural stone tops sized to real storage needs.
Fixtures and hardware
Thermostatic valves, rainhead and handheld combinations, and coordinated cabinet hardware.
Ventilation
Humidity-sensing exhaust fans ducted fully to the exterior, sized to the finished room volume.
Heated floors
Electric radiant mats under tile, thermostatically controlled for cold-morning comfort.

Design Inspiration

Bathroom inspiration

Reference imagery for materials, layout and detailing. These are inspiration images, not completed client projects.

  • Sample Image — Design Inspiration — Freestanding tub with tiled shower surroundSample Image — Design Inspiration
    Freestanding tub with tiled shower surround
  • Sample Image — Design Inspiration — Large-format tile with clean grout linesSample Image — Design Inspiration
    Large-format tile with clean grout lines
  • Sample Image — Design Inspiration — Vanity detailing and fixture pairingSample Image — Design Inspiration
    Vanity detailing and fixture pairing

Process

How a bathroom project runs

The same sequence every time, so you always know what happens next.

  1. 01

    Walkthrough

    We check existing plumbing, ventilation and framing, and talk through what the current bathroom gets wrong.

  2. 02

    Design and selections

    Layout, tile pattern and fixture package assembled together so every choice is compatible before ordering.

  3. 03

    Scope and schedule

    A written scope, allowances where selections are open and a realistic calendar for the room going offline.

  4. 04

    Build

    Demolition, rough plumbing and electrical, inspections, waterproofing, tile, and finish fixtures, in that order.

  5. 05

    Punch and handover

    A shared list, grout sealing confirmed and care notes for stone or heated floor systems.

FAQ

Bathroom remodeling questions

Answers to what homeowners ask most before starting.

How long is a bathroom remodel?

A full bathroom typically takes a few weeks of on-site work once tile and fixtures have arrived. Waterproofing and tile installation are the phases that take real time and should not be rushed.

Will I have a working bathroom during the project?

If it is the only bathroom in the home, we discuss a temporary plan in advance, including phasing options where possible.

Do you handle plumbing and electrical work?

Yes. We coordinate the plumbing and electrical scope, pull the required permits and schedule inspections as part of the build.

Can you fix a shower that has been leaking?

Often the cause is failed waterproofing behind the tile, not the tile itself. We open the wall, assess the framing for damage and rebuild the waterproofing system correctly before retiling.

Can you make a shower curbless for easier access?

In most cases, yes, though it depends on the floor structure and drain location. We evaluate that during the walkthrough and price the framing changes clearly.

Related services

Work that often pairs with this scope.

Sample Image — Design Inspiration

Next step

Start your bathroom

Tell us about the space and what is not working today. We will follow up to schedule a walkthrough across Minneapolis, Saint Paul and the surrounding metro.